Latest posts

South Normanton

This project was designed in conjunction with the contractor, Eco-1 of Walsall.

 

Our MCC8B & MCC10B LCMs have been used throughout the office spaces along with Bluetooth DALI PIRs along the window rows to make the most of natural daylight.

Standard switching detectors, pre-wired to facilitate a quicker and easier install have been used on the same LCMs away from windows and in back of house in toilets / storerooms etc.

Commissioning of Bluetooth PIRs was carried out by our very own technical team.

Posted in: Projects

Leave a comment